Before handing a Chicago-area landscape design to a builder, identify the dated drawings and specifications to use for pricing and the set to use for construction. Keep the rendering with them to show the intended look, but don’t ask the builder to derive a dimension, elevation or material specification from the perspective image. AIA discussion of construction documents and contractor responsibilities
Match visible features to dimensioned sheets
Open the approved view beside the drawing set. Pick a path or patio edge and find the sheet that fixes its width, limits, material and connection to the next surface. Check which existing features are protected, retained or removed. For the planting shown on-screen, match locations to a plant schedule so a generic model tree doesn’t get mistaken for specified stock. Ask for elevations, sections and outlet details wherever construction ties into existing surfaces or drainage. These are examples of information carried on technical landscape drawings, not a universal residential submittal list. GSA landscape documentation example, p. 204
Identify the controlling revision and what it excludes
Record sheet numbers, issue dates and revision labels alongside the corresponding rendering. Ask which documents govern discrepancies under your agreement, who answers questions, which files can go to the contractor, and whether updates are included. List exclusions, unresolved utility information and outstanding approvals so the builder knows what not to assume. Ask which items have been cleared for construction and which are still for review. Drawings and specifications convey design intent; the builder develops the construction methods. GSA documentation example · AIA responsibilities discussion
Walk a critical tie-in before releasing the work
Stand with the builder at a door landing or path connection. Compare one known site dimension and the intended tie-in elevation with the governing sheet. Ask for the topographic fieldwork date, benchmark and vertical reference so the elevation can be traced. If the site, drawing and image disagree, send the discrepancy to the named contact and hold the affected work until the correction is documented. Illinois topographic survey standards, §1270.56(f)(5)